Construction Vehicles
Construction vehicles
International Trade Fair for Construction Machinery,
Building Material Machines, Mining Machines and Construction Vehicles.
All
Construction Vehicles
Construction vehicles
Earth-moving
Earth-moving machines
Road
Construction
Road construction and maintenance equipment/Pipe & cable laying equipment & tools
Lifting
Appliances
Lifting appliances and conveyors
Construction Equipment and tools, Formworks and Scaffolds
Construction equipment, tools and special systems/Formwork and scaffoldings
Mining, Extraction and Processing of Raw Materials
Mining, Extraction and Processing of Raw Materials
Building Material Production
Handling and processing concrete and mortar at construction sites/Production of Building Materials
Transmission Engineering and Fluid Technology
Transmission engineering, fluid technology and power generation units
Component and Service Suppliers
Accessories and spare parts/Services
Intelligent Management
Digital construction site and job safety/Test, measurement and process control engineering/Communication and navigation/Production process equipment
New power technologies
New power technologies
Construction Attachments and Hydraulic Hammers etc.
Hydraulic shears/Hydraulic grapples/Excavator buckets, loader buckets/Quick coupling systems/Grapples/Backhoes/Hydraulic hammers/Hydraulic cutters/Vibratory tools/Auger drives/Fork prongs/carriers/Telescopic pile leaders, fixed leaders

Looking for bauma CHINA brand exhibitors?
CANGZHOU FORWARD ROLL FORMING MACHINERY MANUFACTURE CO., LTD
Headquarters: China
Target Groups: Building material / Construction / Aviation & space / Rental & Trade / Service Suppliers
Public Time: Sep.12, 2026
Public Company: CANGZHOU FORWARD ROLL FORMING MACHINERY MANUFACTURE CO., LTD
在钢结构厂房施工现场,真正影响效率的,往往不是工人数量,而是人员、材料和工具能否同时到达作业面。过去,施工人员需要反复上下攀爬,材料也要依靠吊车或人工多次转运。遇到高空、临边和复杂地面时,施工效率下降,安全风险也随之增加。
针对这一问题,沧州前进机械推出重载高空作业平台,将人员、材料和设备直接送至钢结构高空作业区域。平台面积达114㎡,常规载重3吨,可根据不同项目匹配19米、31米及更高举升高度,最大跨度约9.2米。平台采用T700高强钢和三角翼展结构,配备多组高强油缸、同步调平、智能限位和远程操作系统,在满足承载需求的同时,提高高空施工的稳定性。
在实际施工中,该平台可用于檩条、拉条、隅撑安装,也适用于钢结构墙面板、反吊顶、通风管道和光伏幕棚施工。以檩条安装为例,平台可实现约48根/小时的施工效率;在反吊顶项目中,单日施工面积可达到约2000㎡。某施工团队在使用前进机械设备后,从过去依赖传统登高方式,逐步转向平台化施工,并开始拓展设备租赁业务。客户反馈,施工组织更加集中,人员和材料减少了重复转运,整体效率和安全性都有明显改善。
高空施工设备的价值,不只是“升得更高”,而是让施工人员、材料和工具能够同步到达作业位置。减少一次转运,就意味着减少一次等待和一次风险。未来,重载高空作业平台将继续服务于大型厂房、展馆、高铁站及复杂钢结构项目,推动高空施工向更安全、更高效、更规范的方向发展。
Other news