Construction
Vehicles
Construction vehicles
International Trade Fair for Construction Machinery,
Building Material Machines, Mining Machines and Construction Vehicles.
Construction
Vehicles
Construction vehicles
Earth-moving
Earth-moving machines
Road
Construction
Road construction and maintenance equipment
Lifting
Appliances
Lifting appliances and conveyors
Construction Equipment and tools, Formworks and Scaffolds
Pipe & cable laying equipment & tools/Construction equipment, tools and special systems/Formwork and scaffoldings
Mining, Extraction and Processing of Raw Materials
Machines for extraction of raw materials and for mining/Handling of raw materials/Mineral processing (incl. coke oven equipment)
Building Material Production
Handling and processing concrete and mortar at construction sites/Manufacture of cement, lime and gypsum compounds for building materials/Machines and systems for producing concrete, concrete products and pre-fabricated components/Machines and plants for producing asphalt/Machines and plants for producing pre-mixed Dry mortar, plaster, screed and building supply store products/Machines and plants for producing lime sandstone and building products using power plant residue (fly ash, slag, etc.)/Building material handling and packaging (in a plant)
Transmission Engineering and Fluid Technology
Transmission engineering, fluid technology and power generation units
Accessories, Spare and Wear Parts
Accessories and wear parts
Intelligent Management
Digital Construction Site and Job Safety/Services/Test, measurement and process control engineering/Communication and navigation/Production Process Equipment (in a plant)
Looking for Bauma China brand exhibitors?
Hangzhou as site of the 2022
Asian Games is accelerating from the "West Lake Era" to the
"Qiantang Era". The Olympic body in
Qianjiang Century City has also risen quickly to become a popular residential section
in Hangzhou.
Comansa feels very honored
to play an active role in the construction of star projects in this section- Shanshui Times Building. With a height of 260 meters and 56 floors,
this project will be a new landmark of Olympic sports.
Comansa CML310 took about 15
months from erection to dismantling, successfully completing all construction
tasks. In order to speed up the progress of the project, Comansa
CML310 fully cooperated with the site in three shifts 24 hours a day, to ensure
the smooth completion of this project safely and won the high praise of the
construction side.
CML310 that used in this
project worked in internal climbing method, The advantage of the relatively
long distance between collars(inner frames) reduces the frequency of jacking, significantly saving construction side’s time and cost. Add to the relatively high overhang, to maximize the
advantage of flexible and efficient operation.
Other News